The North American Electric Reliability Corporation (NERC) is a non-profit international regulatory authority designated by our Federal Energy Regulatory Commission (FERC) with the responsibility to assure the reliability of the Bulk‐Power System (BPS) in North America.
Maybe we should send our electeds to Germany for field trip to the energy graveyard. Or show them a few of germanys energy bills from the last two months. Violent stupidity paid for by our taxes.
We need to get back to coal and natural gas while building nukes for the long term. It would be nice if we could let the wind and solar cult be those that would freeze in the winter and swelter in the summer. Since that’s not possible, those who are sane need to push and kick hard to get back to reasonable power generation. The reality. The leftists are wanting us to pay for their mistakes, and lack of coherent thinking.
Maybe we should send our electeds to Germany for field trip to the energy graveyard. Or show them a few of germanys energy bills from the last two months. Violent stupidity paid for by our taxes.
We need to get back to coal and natural gas while building nukes for the long term. It would be nice if we could let the wind and solar cult be those that would freeze in the winter and swelter in the summer. Since that’s not possible, those who are sane need to push and kick hard to get back to reasonable power generation. The reality. The leftists are wanting us to pay for their mistakes, and lack of coherent thinking.
Many people need to “see the light” before it is to late. Thanks for another great article.